Enter the slab and specified base dimensions to get one quantity list. Add a rebar grid only when its spacing, bar size, and inset are already specified for your project.

Your project

Project details

Prices in USD
Use the project specification; this tool does not choose the base depth.
Prices & assumptions
How to measure
LengthWidth
Measure length and width in plan. Depth or thickness is perpendicular to that surface. Calculate different depths separately. Diagram is schematic, not a construction drawing.
Live estimate

Results

Updates as you type
Ready-mix order1.5 yd³
80 lb bags
62
Volume with allowance
36.667 ft³
Measured volume
1.235 yd³
Aggregate base order
2 tons
Base volume with allowance
1.358 yd³

Concrete and aggregate are separate materials. Ready-mix and bags are alternatives; choose one concrete supply method.

This is a quantity list. Depth, reinforcement, subgrade, drainage, forms, and structural design must come from your project specification.

Compare options & manage project 1 section
Options
Loading saved project…

Ready-mix order: 1.5 yd³ View result ↑

Planning estimate, not a contractor quote. Review the assumptions and replace presets with local prices when available.

Method

How this calculator works

A slab project requires separate material quantities. This worksheet combines the concrete-volume calculation with aggregate-base volume and an optional rectangular rebar takeoff. Concrete and base have separate allowances. Steel uses a separate cut and splice allowance. No structural dimensions are selected by this tool.

Formula

Concrete = length × width × thickness × concrete allowance. Base = length × width × base depth × base allowance. Base tons = adjusted cubic feet × density ÷ 2,000. Steel = the sum of drawing-specified grid runs plus the entered steel allowance.

Worked example

A realistic starting point

A 10 × 10 ft slab, 4 in thick, with 10% concrete allowance needs a 1.50 yd³ order or 62 nominal 80 lb bags. A separate 4 in base at 105 lb/ft³ with 10% allowance contains about 1.36 yd³ and rounds to a 2 US ton order. Rebar is excluded until you enable it and enter the drawing values.

What changes the answer

Factors worth checking

01

Separate layers

Slab thickness is the concrete layer only. Base depth is the compacted aggregate layer underneath it.

02

Specified reinforcement

Use bar size, spacing, inset, and layer count from the project design. The optional grid represents one rectangular layer.

03

Ordering and offcuts

Whole bags, bulk-load rounding, and theoretical stock-bar equivalents use different purchasing conventions.

04

Other materials

Forms, chairs, tie wire, vapor barriers, drainage, curing products, and specialty details need separate takeoffs.

Common questions

Slab shopping list FAQ

Does this design the slab or reinforcement?

No. It calculates quantities from dimensions and grid settings you supply. It does not determine loads, thickness, bar size, cover, or structural suitability.

Should I order both ready-mix and bags?

Usually these are alternative ways of buying the calculated concrete. The worksheet shows both so you can choose a supply method.

Is this a complete construction shopping list?

It covers concrete, base aggregate, and optionally grid steel. Forms, supports, membranes, drainage, curing materials, and other specification details remain separate.

Evidence

Sources & review

Published by Calcstead. Report a correction.

Method and source links reviewed September 5, 2026. Price presets are editable planning inputs and should be replaced with current local information.