Post Hole Concrete Calculator

Enter the filled concrete depth, hole shape and size, number of holes, and actual post dimensions. The calculator subtracts the embedded post volume and rounds the selected bag size up to whole bags.

Your project

Project details

Prices in USD
Exclude gravel and soil backfill.
How to measure
Diameter
Use the filled concrete depth only. Exclude the gravel base and soil backfill; enter the actual post dimensions. Diagram is schematic, not a construction drawing.
Live estimate

Results

Updates as you type
50 lb bags4
Ready-mix order
0.25 yd³
Volume with allowance
1.483 ft³
Measured concrete volume
1.349 ft³

Concrete depth is the filled height; exclude any gravel base and soil backfill.

Hole size and depth depend on loads, soil, frost depth, and local requirements; this is a quantity estimate, not a footing design.

Compare options & manage project 1 section
Options
Sections
Loading saved project…

50 lb bags: 4 View result ↑

Planning estimate, not a contractor quote. Review the assumptions and replace presets with local prices when available.

Method

How this calculator works

Post-hole concrete fills the space between the excavation and the embedded post. A round hole is calculated as a cylinder; a square hole is a rectangular prism. If a post is embedded through the full concrete depth, its actual cross-section can be subtracted before the allowance is added.

Formula

Concrete volume = (hole cross-sectional area − post cross-sectional area) × filled concrete depth × hole count. Adjusted volume = concrete volume × (1 + allowance percentage). Bags = adjusted cubic feet ÷ nominal bag yield, rounded up.

Worked example

A realistic starting point

One 12 in round hole filled 24 in deep around an actual 4 in by 4 in post contains 1.35 ft³ of concrete before allowance. With 10% added, the estimate is 1.48 ft³, which rounds to 4 nominal 50 lb bags.

What changes the answer

Factors worth checking

01

Filled depth, not excavation depth

Exclude any gravel drainage layer and the soil left above the concrete. Enter only the height that will actually contain concrete.

02

Use actual post dimensions

Nominal lumber dimensions may differ from measured dimensions. Subtract the section that is actually embedded in the concrete.

03

Irregular holes use more

Augered and hand-dug holes can flare, cave in, or vary in diameter. Increase the allowance when the excavation is not uniform.

04

Product yield controls bags

Bag yields vary by product and package size. Confirm the yield printed on the selected mix before purchase.

Common questions

Post-hole concrete FAQ

Should I subtract the post from the hole volume?

Yes when the post is embedded through the concrete. Select the post shape and enter its actual dimensions. Select ‘Do not subtract post’ for an anchor set into the top of the concrete.

How deep should a post hole be?

Depth depends on above-ground height, loads, soil, frost depth, and local requirements. Use the depth specified for the project; the calculator does not design the foundation.

How wide should the hole be?

QUIKRETE’s general post-setting instructions use a hole about three times the post width, but structural posts and local conditions can require a different size. Follow the project design and local rules.

Why does the calculator round up bags?

Concrete mix is sold in whole bags, so any partial calculated bag requires another package. Yield is nominal and field conditions can increase usage.