Common-size reference

Concrete Slab Cost by Common Size

Last reviewed September 6, 2026

Quick verdict

Multiply slab area by a quoted installed rate, then add excluded work and fixed charges. The table demonstrates costs at hypothetical $8, $12, and $16 per ft²; these are calculation scenarios, not local quotes or national averages.

Use the related calculator →

Reference table

Slab costs at explicit example installed rates

Hypothetical rates for arithmetic only. Replace them with equivalent local scopes. Removal, finish upgrades, and fixed charges are excluded.

Slab sizeAreaAt $8/ft²At $12/ft²At $16/ft²
8×8 ft64 ft²$512$768$1,024
10×10 ft100 ft²$800$1,200$1,600
12×12 ft144 ft²$1,152$1,728$2,304
12×16 ft192 ft²$1,536$2,304$3,072
16×20 ft320 ft²$2,560$3,840$5,120
20×20 ft400 ft²$3,200$4,800$6,400
20×24 ft480 ft²$3,840$5,760$7,680
24×24 ft576 ft²$4,608$6,912$9,216
30×40 ft1,200 ft²$9,600$14,400$19,200
40×60 ft2,400 ft²$19,200$28,800$38,400

01

Convert area into a local cost range

Multiply the exact area by current low, typical, and high installed rates for equivalent local scopes. Keep finish, demolition, reinforcement, access, permits, and other extras editable rather than burying them in an unexplained national average.

For a 20×20 ft slab, area is 400 ft². At the hypothetical $12/ft² example rate, the subtotal is $4,800. Adding $600 of genuinely excluded fixed work gives $5,400. This arithmetic does not certify that $12/ft² is available locally.

  • Low estimate = area × editable low rate.
  • Typical estimate = area × editable typical rate.
  • High estimate = area × editable high rate.
  • Add fixed charges and project-specific extras separately.

02

What scales and what does not

Concrete volume and many broad-area quantities grow predictably. Mobilization, small-job minimums, difficult access, pump setup, drainage correction, and design work can behave as fixed or nonlinear costs.

Cost behavior

Usually area or volume drivenOften fixed or nonlinear
Concrete volumeMobilization
Base material quantitySmall-job minimum
Broad-area finish laborPump setup
Demolition areaRestricted access
Some reinforcement quantityDrainage correction
Surface treatment areaPermit or design work

03

Check concrete volume separately

The volume table isolates geometry before allowance or supplier rounding. Installed cost rates normally include some material scope; use this quantity as a cross-check rather than charging concrete a second time on top of the installed rate.

  • Calculate thickened edges, footings, and piers separately.
  • Use the exact formed dimensions.
  • Replace presets with dated supplier and contractor inputs.

Concrete volume by common slab size

Geometric quantities before allowance or supplier rounding.

SizeArea4 in volume6 in volume
8×8 ft64 ft²0.79 yd³1.19 yd³
10×10 ft100 ft²1.23 yd³1.85 yd³
12×12 ft144 ft²1.78 yd³2.67 yd³
12×16 ft192 ft²2.37 yd³3.56 yd³
16×20 ft320 ft²3.95 yd³5.93 yd³
20×20 ft400 ft²4.94 yd³7.41 yd³
20×24 ft480 ft²5.93 yd³8.89 yd³
24×24 ft576 ft²7.11 yd³10.67 yd³
30×40 ft1,200 ft²14.81 yd³22.22 yd³
40×60 ft2,400 ft²29.63 yd³44.44 yd³

Limits

What this comparison does not decide

  • The cost table uses hypothetical rates; the separate volume table contains geometric quantities before allowance.
  • Cost rates should be local, editable, dated, and scoped.
  • BLS producer-price indexes track price change; they are not installed retail quotes.

Common questions

Concrete Slab Cost by Common Size FAQ

How much does a 20×20 concrete slab cost?

At hypothetical installed rates of $8, $12, and $16 per ft², its 400 ft² gives subtotals of $3,200, $4,800, and $6,400 before excluded extras. These demonstrate the calculation; obtain a scoped local quote for an actual price.

How much concrete does a 10×10 slab need?

About 1.23 yd³ at 4 inches or 1.85 yd³ at 6 inches, before allowance.

How much concrete does a 20×20 slab need?

About 4.94 yd³ at 4 inches or 7.41 yd³ at 6 inches, before allowance.

Why is my quote higher than area times a rate?

Fixed charges, base work, access, finish, demolition, drainage, and minimums may sit outside a simple area rate.

Should order quantity equal geometric volume?

Usually the estimate should expose a separate allowance and supplier-specific rounding before purchase.