Concrete

Concrete Cost per Yard: 2026 Prices and Delivery Math

A price per cubic yard is useful only when you know the mix, the billing rules and what delivery includes. These public supplier examples show how to read a quote, then build a total for your own project.

By Calcstead5 min read

The short answer

Two public 2026 lists show $148/yd³ for Gehring’s SG-3000 mix and $174/yd³ for American Concrete’s 3,000 PSI COD price, before applicable extras. These are individual supplier examples checked September 23, 2026, not a national average or a quote for your location.

Use the ready-mix vs. bags calculator

Try your numbers

Build your concrete supply estimate

Replace the example inputs with one supplier’s quote. Apply its billed volume and order rounding first.

Project inputs
Estimated supply subtotal$494.00
Material after minimum$444.00
Subtotal per billed yard$164.67 /yd³

Total = the greater of volume × rate or the minimum material charge, plus separate fees. Add only fees outside that minimum. Taxes and placement labor are excluded.

On this page

Published 2026 supplier prices

The examples below come directly from supplier price pages. Their mix descriptions, account terms and delivery areas differ, so use them to understand the structure of a quote rather than to select a universal rate. Confirm availability, project specifications and current terms with the plant.

Public price examples checked September 23, 2026

Listed yard rates only. Applicable minimums, fees and taxes can change the invoice. Source links and effective dates are provided below.

Supplier and list dateListed mix / customer basisPrice per yd³
Gehring · Jan 1, 2026SG-3000, 6 bag, sand gravel$148
Gehring · Jan 1, 2026SG-4000, 7 bag, sand gravel$156
American Concrete · Apr 1, 20263,000 PSI, COD customer$174
American Concrete · Apr 1, 20264,000 PSI, COD customer$182

Why a small order can cost more per yard

Gehring lists a $50 small-load charge for orders under 4 yards and states that sales tax is excluded. Three yards of its listed $148 mix plus that small-load charge gives $494, or about $164.67 per ordered yard, before any other applicable charges.

American Concrete separately lists a $820 minimum purchase for COD 3,000 PSI orders of 4 yards or less. At a 3-yard requirement, that minimum alone is about $273.33 per required yard. Ask how delivery and other extras interact with the minimum before calculating the final invoice.

A minimum material charge replaces a lower material subtotal; it is not automatically an extra fee added to that subtotal. A separate delivery or short-load fee is added only when the supplier’s terms say it applies.

Build the supply total in four steps

First calculate the actual concrete requirement from measured geometry and the project’s chosen allowance. Next apply the supplier’s ordering increment and billed-volume rules. Then calculate the material charge and any applicable minimum. Finally add separate fees and tax on the basis shown in the quote.

For the compact calculator above, use: supply subtotal = max(billed yards × quoted rate, minimum material charge) + separate fees. Enter zero for a minimum that does not apply. The result excludes tax and installation. If a quoted minimum already includes a fee, do not include that fee a second time.

Illustrative quote worksheet

This worksheet uses invented terms to demonstrate the formula; it is not either supplier’s quoted order.

LineExample basisAmount
Billed material3 yd³ × $160$480
Minimum material chargeExample minimum $600 replaces $480$600
Separate feesExample total for delivery and extras$90
Supply subtotalmax($480, $600) + $90$690

Convert a slab into yards before comparing quotes

For a uniform rectangular slab, cubic yards = length in feet × width in feet × thickness in inches ÷ 324. A 20 × 20 ft slab at 4 inches contains 4.93827… yd³. An example 10% allowance raises that to 5.43210… yd³.

If a supplier rounds the required quantity up to the next quarter yard, this example orders 5.5 yd³. The supplier may use a different increment or a separate minimum bill. Slab edges, footings or other sections must be measured separately without double-counting overlapping concrete.

Keep the required physical volume and billed volume visible. Dividing an invoice by billed yards and dividing it by the project’s geometric yards answer different questions.

Ask which extras are already included

A short-load fee, distance charge, minimum purchase and delivery fee can describe different terms. Confirm each on the actual quote. Waiting time, a pump, special admixtures, weekend service and cleanup may also change the cost. An apparently cheaper yard rate can result in a larger total.

Use the same required mix and service scope when comparing plants. A lower price for a different specification is not a like-for-like alternative.

  • Specify the job location, mix requirement, volume and delivery date.
  • Ask for the billed quantity and any material minimum.
  • List delivery, short-load and other separate charges.
  • Confirm included unloading time, tax and how extra time is billed.
  • Record quote validity and cancellation terms supplied by the vendor.

Compare ready-mix with bags on the same basis

The referenced QUIKRETE mix lists a nominal 0.60 ft³ yield for an 80 lb bag. One cubic yard is 27 ft³, so 45 such bags provide a nominal yard before allowance. For 3 exact yards, the corresponding base quantity is 135 bags.

At an invented $7 per bag, those 135 bags cost $945 before delivery, mixing equipment and handling. This is a calculation example, not a current retail price. Enter the price and yield of the actual mix in the ready-mix versus bags calculator.

Keep site preparation, forms, reinforcement, placing, finishing and curing outside a material-only comparison, or include the same scope on both sides. A delivered concrete subtotal is not an installed slab price.

Common questions

Is there one concrete price per yard for the whole US?

No. This guide shows individual dated supplier lists, not a national average. Mix specifications, order size, delivery location and billing terms determine the quote.

Is delivery included in the price per yard?

It depends on the supplier and quote. Ask whether delivery is included, whether small-load or distance charges apply, and which fees a minimum purchase already covers.

Does the yard price include pouring and finishing?

A ready-mix supply rate does not establish an installed price. Confirm preparation, placement, reinforcement, finishing and other work separately.

How much does one yard of concrete cover at 4 inches?

The geometric coverage is 27 ÷ (4 ÷ 12) = 81 ft² before allowance, thickened edges or separate footings. Required slab thickness comes from the project specification.